CANADA - Toronto activists lock down to equipment at Enbridge Line 9 river crossing
#LockDownLine9: Toronto activists lock down to equipment at Enbridge Line 9 river crossing
mediacoop.ca
(Toronto,
ON) Members of Rising Tide Toronto have locked down to equipment at an
Enbridge Line 9 river crossing, effectively halting construction. This
construction is taking place before the NEB has approved this pipeline
reversal
No comments:
Post a Comment